Roosevelt Way NE Improvements

TranTech provided construction inspection for the reconstruction of NE Roosevelt Way,from NE 65th to NE 40th, including the University Bridge in Seattle, WA.

The project included full-depth roadway repairs, subgrade repairs, ADA ramps, catch basins with storm lines, and pavement markings including a designated bike lane for the length of the project.

New bus stops with foundations for shelters, conduits, illumination and stamped concrete borders required coordination with King County Metro for inspection of the bus shelter footings and SPU’s electrical department for illumination conduits.

Client: Seattle Department of Transportation

[ Back ]