Roeder Avenue Bridge Construction Administration

Roeder Avenue Bridge Construction Administration City of Bellingham

Central Avenue Improvements

Central Avenue Improvements City of Bellingham

Inspection, Load Rating and Bridge Rehabilitation

Inspection, Load Rating and Bridge Rehabilitation City of Bellingham

Old 99 (Riverside Drive) Improvements

Old 99 (Riverside Drive) Improvements Cities of Mount Vernon & Burlington

I-405 South Bellevue Design/Build Project

I-405 South Bellevue Design/Build Project WSDOT

Middle Fork Bridge Rehabilitation Construction

Middle Fork Bridge Rehabilitation and Construction Management, City of Bellingham

  • Sound Transit Lakewood Layover Yard

    Friday, 23 September 2011 00:00
  • Broadway Avenue Bridge Replacement

    Thursday, 22 September 2011 00:00
  • Roeder Avenue Bridge Construction Administration

    Thursday, 15 September 2011 06:46
  • Central Avenue Improvements

    Thursday, 15 September 2011 06:40
  • Inspection, Load Rating and Bridge Rehabilitation

    Thursday, 15 September 2011 04:29
  • Old 99 (Riverside Drive) Improvements

    Thursday, 15 September 2011 03:55
  • I-405 South Bellevue Design/Build Project

    Thursday, 15 September 2011 03:47
  • Middle Fork Bridge Rehabilitation Construction

    Thursday, 15 September 2011 03:22

Inspection, Load Rating and Bridge Rehabilitation

Inspection, Load Rating and Bridge Rehabilitation

City of Bellingham

TranTech has provided the City of Bellingham bridge load rating, condition inspection and Bridge Rehabilitation services for the City’s 42 bridges and culverts in 2005. As part of the 2005 inspections cycle contract, TranTech has helped the City in three areas. First, TranTech has assisted the City to bring their bridge and culvert load rating reports up to today’s standards according to the AASHTO and WSDOT guidelines. Second, TranTech has helped the City in rehabilitation of the Eldridge Ave Bridge which is the subject of a watermain crossing. Third, field inspections and reports were conducted and prepared in strict conformance with WSDOT and FHWA criteria.

 

 
Services

TranTech Bridge Projects Requiring Overcrossing BNSF Railway Tracks

Structural Engineering:
TranTech's structural engineering group provides comprehensive services for structural design of bridges; highways and other industrial facilities. We also provide services in the areas of seismic retrofit, structural condition inspection and load rating of bridges.

Civil Engineering:
TranTech’s civil engineers provide comprehensive services for roadway design; drainage & stormwater treatment; traffic signals and illumination design.

Construction Management:
TranTech’s construction administration team provides services in the areas of contract administration, construction inspection and materials testing coordination and management, resident engineering, contractor work coordination.