Roeder Avenue Bridge Construction Administration

Roeder Avenue Bridge Construction Administration City of Bellingham

Central Avenue Improvements

Central Avenue Improvements City of Bellingham

Inspection, Load Rating and Bridge Rehabilitation

Inspection, Load Rating and Bridge Rehabilitation City of Bellingham

Old 99 (Riverside Drive) Improvements

Old 99 (Riverside Drive) Improvements Cities of Mount Vernon & Burlington

I-405 South Bellevue Design/Build Project

I-405 South Bellevue Design/Build Project WSDOT

Middle Fork Bridge Rehabilitation Construction

Middle Fork Bridge Rehabilitation and Construction Management, City of Bellingham

  • Sound Transit Lakewood Layover Yard

    Friday, 23 September 2011 00:00
  • Broadway Avenue Bridge Replacement

    Thursday, 22 September 2011 00:00
  • Roeder Avenue Bridge Construction Administration

    Thursday, 15 September 2011 06:46
  • Central Avenue Improvements

    Thursday, 15 September 2011 06:40
  • Inspection, Load Rating and Bridge Rehabilitation

    Thursday, 15 September 2011 04:29
  • Old 99 (Riverside Drive) Improvements

    Thursday, 15 September 2011 03:55
  • I-405 South Bellevue Design/Build Project

    Thursday, 15 September 2011 03:47
  • Middle Fork Bridge Rehabilitation Construction

    Thursday, 15 September 2011 03:22

South 200th Street, Green River Bridge*

South 200th St. Green River Bridge
City of Kent

TranTech staff, David Belling and Bill Barton provided Construction Administration Management, Construction Inspection and Materials Testing during the construction phase of this project respectively. The project consists of a two-span concrete bridge over the Green River at South 200th Street. The bridge consists of wall piers each supported on three six-foot diameter 90-foot drill shafts with a cast-in-place box girder pier table on five six-foot diameter 120-foot drill shafts and prestressed girders post-tensioned into a continuous superstructure. Also included were a retaining wall, a bike path beneath the bridge, a cul-de-sac, and pavement widening on an adjacent City street, an access ramp on the river dike, river bank slope protection and installation of habitat logs, rocks, and rooted live tree branches.

 
Services

TranTech Bridge Projects Requiring Overcrossing BNSF Railway Tracks

Structural Engineering:
TranTech's structural engineering group provides comprehensive services for structural design of bridges; highways and other industrial facilities. We also provide services in the areas of seismic retrofit, structural condition inspection and load rating of bridges.

Civil Engineering:
TranTech’s civil engineers provide comprehensive services for roadway design; drainage & stormwater treatment; traffic signals and illumination design.

Construction Management:
TranTech’s construction administration team provides services in the areas of contract administration, construction inspection and materials testing coordination and management, resident engineering, contractor work coordination.